Guides for installation and assembly of the LulzBot line of products made by FAME 3D LLC.
1x [AS-TH0088] Twin Nebula 175 (0.5mm), LGX Assembly
1x [DC-LB0012] White 7 x 1/2 x 2 laser label
1x [DC-LB0160] Tool Head Serial Number Sticker, Matte Silver, 1" x 0.5", Thermal
1x [DC-LB0229] T.B.D. TWIN NEBULA 175 LABEL
1x [DC-MS0054] Firmware Update Warning Cards
1x [DC-MS0060] CONGRATULATIONS!- Accessory Instruction Card, V1.2
1x [EL-HR0230] Twin Nebula E0 Jumper
1x [EL-HR0231] Twin Nebula E1 Jumper Harness
4x [HD-BT0157] Class 12.9 Alloy Steel Black-Oxide SHCS, M3 x 8mm Length, 0.50mm Pitch
160mm [HD-TB0007] Feed Tube, 0.187" ID X .250" OD NAT PTFE Tube
1800mm [HD-TB0080] Feed Tube, 2mm ID X 4mm OD NAT PTFE Tube
2x [PP-GP0524] Feed Tube 175Converter_ProS/SideKick
1x [PP-GP0940] Tube Collar 2 1.75mm
1x [PP-GP0941] Tube Collar 1 1.75mm
1x [SH-PA0016] 8 X 8 Convoluted Foam 2 pc Set
1x [SH-PA0066] TAZ Pro, Tool Head Korrvu 8" x 8" x 6" Outer Box
2x [SH-PG0002] 3 x 4" 2 Mil Reclosable Polypropylene Bags
1x [SH-PG0003] 4 x 6" 2 Mil Reclosable Polypropylene Bags 1,000/carton
813mm [SH-PG0131] Custom Printed LulzBot White Tape
2x TAZ Pro Kit Label
1x Jumper Cables Label
2A) Cut two 80mm pieces of HD-TB0007 and grab 2x SH-PG0002, 2x PP-GP0524, 4x HD-BT0157, and 2x TAZ Pro label.
2B) Insert the tubes into the 2x PP-GP0524 and secure using 4x HD-BT0157. Be careful not to over tighten the screws.
2C) Put the TAZ Pro label on 1x SH-PG0002 and put the tube assembly in the bag.
2D) Grab 1x EL-HR0230, 1x EL-HR0231, 1x SH-PG0003, and 1x Jumper Cable label.
2E) Put the Jumper Cable label on SH-PG0003 and put EL-HR0230 and EL-HR0231 inside the bag.
2F) Cut two 900mm pieces of HD-TB0080. Put 1x PP-GP0940 on one tube and 1x PP-GP0941 on the other.
3A) Turn on the tape machine and the heater. The heater should be on for 20-30 minutes before using.
3B) Grab 1x SH-PA0066. Fold up the box and secure the bottom using a 16in. (Short Length if in Tool Heads) piece of tape.
3C) Clean up the corners of the box using a side cutter.
3D) Place the back label from DC-LB0229 on the back of the box and place the front label from DC-LB0229 on the front of the box. Note the box orientation.
3E) Place DC-LB0012 on the inside of the back flap of the box as shown.
3F) Place one half of SH-PA0016 in the box. Place 1x DC-MS0054 and 1x DC-MS0060 in the back of the box between the foam and box.
3G) Place the two tubes in the box.
3H) Place AS-TH0088 in the box.
3I) Place all three kit bags in the box.
3J) Place the other half of SH-PA0016 in the box. Close the box and secure using a 16in. (Short Length if in Tool Heads) piece of tape.
3K) Clean up the corners of the box using a side cutter.
3L) Place 1x DC-LB0160 on the front label where shown.