Project Dashboard Packaging Tool Head Packaging Meteor 175 Packaging Workflow

1 Gather Materials

1x [AS-TH0085] Meteor 175 (0.5mm), LGX Ace Assembly
1x [DC-LB0012] White 7 x 1/2 x 2 laser label
1x [DC-LB0160] Tool Head Serial Number Sticker, Matte Silver, 1" x 0.5", Thermal
1x [DC-LB0226] Meteor 175 Tool Head Label, Front and Back 7 X 3
1x [DC-LB0231] Meteor 175 Tool Head Label, Back
1x [DC-MS0054] Firmware Update Warning Cards
1x [DC-MS0060] CONGRATULATIONS!- Accessory Instruction Card, V1.2
2x [HD-BT0157] Class 12.9 Alloy Steel Black-Oxide SHCS, M3 x 8mm Length, 0.50mm Pitch
1x [HD-MS0058] Wire Tie, 8" Black, pk 1000
80mm [HD-TB0007] Feed Tube, 0.187" ID X .250" OD NAT PTFE Tube
900mm [HD-TB0080] Feed Tube, 2mm ID X 4mm OD NAT PTFE Tube
1x [PP-GP0524] Feed Tube 175Converter_ProS/SideKick
1x [PP-GP0653] Feed Tube Spinner 2.85mm_TAZ SideKick
1x [SH-BX0080] 7 X 7 X 4 White Indestructo Box
1x [SH-PA0016] 8 X 8 Convoluted Foam 2 pc Set
2x [SH-PG0002] 3 x 4" 2 Mil Reclosable Polypropylene Bags
2x [SH-PG0129] Laser Labels - White, 1 1⁄2 x 1 1⁄2"
812.8mm [SH-PG0131] Custom Printed LulzBot White Tape

Materials

2 Kits

2A) Cut an 80mm piece of HD-TB0007 and grab 1x SH-PG0002, 1x PP-GP0524, 2x HD-BT0157, and 1x TAZ Pro label.

2B) Insert the tube into PP-GP0524 and secure using 2x HD-BT0157. Be careful not to over tighten the screws.

2C) Put the TAZ Pro label on 1x SH-PG0002 and put the tube assembly in the bag.

2D) Grab 1x SH-PG0002, 1x HD-MS0058, 1x PP-GP0653, and 1x Workhorse/SideKick label

2E) Put the Workhorse/Sidekick label on SH-PG002 and put HD-MS0058 and PP-GP0653 inside the bag

2A
2B
2C
2C1
2D
2E
2E1

3 Boxing

3A) Turn on the tape machine and the heater. The heater should be on for 20-30 minutes before using.

3B) Fold up SH-BX0080 and place DC-LB0012 where shown.

3C) Cut a 900mm piece of HD-TB0080. Place one half of SH-PA0016 in the box with the tube on top.

3D) Place AS-TH0085 and the two kits in the box.

3E) Place the other half of SH-PA0016 in the box with DC-MS0054 and DC-MS0060 on top and close up the box.

3F) With the heater warmed up, cut a 10in. (Long Length if in Tool Heads) piece of SH-PG0131 and place on each side of the box.

3G) Cut a 12in. piece of SH-PG0131 and place across the front of the box.

3H) Place DC-LB0231 on the back of the box.

3I) Place DC-LB0226 on the front of the box.

3J) Place DC-LB0160 on DC-LB0226 where shown.

3A
3B
3C
3D
3E
3E1
3F
3F1
3G
3H
3I
3J
Complete
Done! Take me home