Project Dashboard Packaging Tool Head Packaging Asteroid Packaging Workflow

1 Gather Materials

1x [AS-TH0087] Asteroid 285 (1.2mm), LGX Ace Assembly
1x [DC-LB0012] White 7 x 1/2 x 2 laser label
1x [DC-LB0160] Tool Head Serial Number Sticker, Matte Silver, 1" x 0.5", Thermal
1x [DC-LB0228] ASTEROID Tool Head LABEL, Front
1x [DC-LB0302] ASTEROID TOOL HEAD LABEL, BACK
1x [DC-MS0054] Firmware Update Warning Cards
1x [DC-MS0060] CONGRATULATIONS!- Accessory Instruction Card, V1.2
1x [HD-MS0058] Wire Tie, 8" Black, pk 1000
900mm [HD-TB0009] Hard Polypropylene Plastic Tubing 4 mm ID 6 mm OD
1x [PP-GP0653] Feed Tube Spinner 2.85mm_TAZ SideKick
1x [SH-BX0080] 7 X 7 X 4 White Indestructo Box
1x [SH-PA0016] 8 X 8 Convoluted Foam 2 pc Set
812.8mm [SH-PG0131] Custom Printed LulzBot White Tape

Materials

2 Boxing

2A) Turn on the tape machine and the heater. The heater should be on for 20-30 minutes before using.

2B) Cut a 900mm piece of HD-TB0009 and place PP-GP0653 on one end securing it with HD-MS0058. Use the zip tie puller to ensure it's secure.

2C) Fold up SH-BX0080 and place DC-LB0012 where shown.

2D) Place one half of SH-PA0016 in the box with the tube on top.

2E) Place AS-TH0087 in the box.

2F) Place the other half of SH-PA0016 in the box with DC-MS0054 and DC-MS0060 on top and close up the box.

2G) With the heater warmed up, cut a 10in. (Long Length if in Tool Heads) piece of SH-PG0131 and place on each side of the box.

2H) Cut a 12in. piece of SH-PG0131 and place across the front of the box.

2I) Place DC-LB0302 on the back of the box.

2J) Place DC-LB0228 on the front of the box.

2K) Place DC-LB0160 on DC-LB0228 where shown.

2A
2B
2C
2D
2E
2F
2F1
2G
2G1
2H
2I
2J
2K
Complete
Done! Take me home